home | privacy | search site | site map | contact us | news | survey order form | links
Engineering and SurveyingPipeline GroupAbout UsCareers
 
   
Overview
Services
Project Examples
Representative Clients

 

 

Jamestown Pipeline Project
MichCon/DTE Energy
Kent and Ottawa Counties, Michigan

HEI's Pipeline Group is currently assisting MichCon/DTE Energy with surveying and construction management services for the Jamestown Pipeline Project.  The proposed pipeline will be 16.66 miles  of 30" transmission pipeline to be located in Kent and Ottawa Counties, Michigan.  The construction commenced last spring with approximately 7 miles of pipeline installed in 2007 and the remaining to be installed in 2008. 

Design services – preliminary and as-built drafting services including alignment sheets, permit drawings, "Act 9 maps" and plats

Construction services - preliminary, construction and as-built surveying and construction management services

Other services – used internal landscape design staff to provide a landscape design for the Hudsonville Tap Site and the Byron Center Gate Station

>>View more Project Examples