Bare Steel Cast Iron Replacement

BRIEF

Dominion East Ohio initiated its Pipeline Infrastructure Replacement Program in 2009, with the goal of replacing 5,500 miles of bare steel distribution pipe throughout their 21,000-mile system. In 2014, we were selected to perform a large portion of Dominion’s gas distribution replacement design work.

Our design work included pipe abandonment and replacement, betterment, horizontal directional drills, bores, casings, and complete tie-in to existing facilities. We also performed topographic and boundary surveys of the project areas and generated a set of pipeline design drawings according to Dominion’s standards.

PROJECT DETAILS

Client:
Dominion East Ohio

Location:
Cuyahoga County, OH

Services
Energy
Drafting
HDD Design
Survey

SAFETY DETAILS

100%
Project Safety Score
Zero Incidents

Total hours worked: 137 Hours

Total miles driven: 267 Miles

26 Awards Given for On the Spot Safety