Dominion East Ohio initiated its Pipeline Infrastructure Replacement Program in 2009, with the goal of replacing 5,500 miles of bare steel distribution pipe throughout their 21,000-mile system. In 2014, we were selected to perform a large portion of Dominion’s gas distribution replacement design work.
Our design work included pipe abandonment and replacement, betterment, horizontal directional drills, bores, casings, and complete tie-in to existing facilities. We also performed topographic and boundary surveys of the project areas and generated a set of pipeline design drawings according to Dominion’s standards.