TC Energy Environmental Assistance

BRIEF

Holland Engineering, Inc.’s Environmental Services Division has been busy this fall working with TC Energy’s Pipeline Company throughout Michigan. HEI’s Environmental staff have performed wetland delineations, stream assessments, threatened and endangered species assessments, wetland and stream restoration design, biological habitat assessments, unanticipated discovery plans, constructability and feasibility reviews for multiple anomaly dig sites and pipeline replacement projects. Our experienced staff has also been serving as Environmental Inspectors for construction activities; including daily reporting, contractor coordination, soil sampling, water sampling, asbestos sampling, compaction testing, agricultural inspection, archaeological inspection, and ensuring environmental compliance on the project site.

HEI has utilized its strong regulator relationships through coordination with the Michigan Department of Environmental Quality (MDEQ) for soil erosion permits, wetlands permits, and hydrostatic water discharge and withdrawal permits to meet project schedules and demands. In addition, HEI obtained project clearances with the Michigan Department of Natural Resources (MDNR) and Section 106 with Michigan Historic Preservation Office (SHPO). These projects have been a collaborative effort between HEI’s Environmental Services, Surveying, and Engineering staff members providing TC Energy with a complete project team throughout project planning and construction.

PROJECT DETAILS

Client:
TC Energy, ANR Storage

Location:
Otsego County, Michigan

Services
Construction Phase Services
Design
Energy
Environmental
Site Feasibility Studies
Permitting
Survey

SAFETY DETAILS

100%
Project Safety Score
Zero Incidents

Total hours worked: 137 Hours

Total miles driven: 267 Miles

26 Awards Given for On the Spot Safety