Line 3 Segment 18

BRIEF

Beginning at the Minnesota/Wisconsin state line, the Line 3 Segment 18 pipeline runs east to Enbridge’s Superior, WI, terminal. The 14-mile Segment 18 portion consists entirely of 36-inch-diameter spiral-welded pipe.

We provided construction surveying services for the pipeline, including conducting 4-way sweeps, drafting alignment sheets, and creating acquisition drawings and as-built alignment sheets. Additional surveying services included construction staking and pipeline weld as-built.

PROJECT DETAILS

Client:
Enbridge Energy

Location:
Superior, WI

Services
Construction Phase Services
Energy
Drafting
Survey

SAFETY DETAILS

100%
Project Safety Score
Zero Incidents

Total hours worked: 137 Hours

Total miles driven: 267 Miles

26 Awards Given for On the Spot Safety