BRIEF
Holland Engineering, Inc. (HEI) assisted Michigan Gas Utilities (MGU) with a replacement distribution pipeline approximately 7,800’ in length located in Marshall, Michigan.
Engineering design work included surveying, acquisition, design/drafting, and compilation of as-built documentation with resources from the inspection contractor. HEI also communicated with all inspection contractors, surveyors, government officials, and MGUC engineering and environmental representatives.
Land surveying efforts included route survey, staking, parcel research/mapping, easement exhibits, and base map. HEI surveyors completed a topographic and easement/boundary survey of the selected sites along the proposed running line.
PROJECT DETAILS
Location:
Marshall, MI
Services
Engineering
Survey
Design/Drafting
SAFETY DETAILS
100%
Project Safety Score
Zero Incidents
Zero Incidents
Total hours worked: 137 Hours
Total miles driven: 267 Miles
26 Awards Given for On the Spot Safety
FOR MORE INFORMATION