PH Alger Ravine – DSCN9585 (Medium)
Alger Ravine
The Alger Ravine Project involved the stabilization of a stream where it became incised and was experiencing high stormwater flows.
Environmental
Engineering
Engineering
PH – Croton Dam
Croton Dam
As part of the Croton Dam wall replacement project, our group assisted Consumers Energy with a freshwater mussel survey on the Muskegon River.
Environmental
Survey
Survey
Clinton River Mussel Survey
Coordinating with USFWS and Michigan DNR to Complete an Emergency Mussel Survey
Holland Engineering and Niswander Environmental, on behalf of Rochester University, recently completed an emergency mussel survey for the Clinton River Bank Stabilization Project.
Read More
PH – TC Energy Environmental Services Featured
TC Energy Environmental Assistance
Holland Engineering, Inc.’s Environmental Services Division has been busy this fall working with TransCanada’s Pipeline Company throughout Michigan.
Construction Phase Services
Design
Energy
Environmental
Site Feasibility Studies
Permitting
Survey
Design
Energy
Environmental
Site Feasibility Studies
Permitting
Survey