Line 3 Segment 18

Beginning at the Minnesota/Wisconsin state line, the Line 3 Segment 18 pipeline runs east to Enbridge’s Superior, WI, terminal.
Construction Phase Services
Energy
Drafting
Survey

Wixom Road Mussel Surveys

As part of a mussel survey and relocation project, our biologists completed snorkel surveys of the Huron River in metro Detroit.
Environmental
Survey

Bald Mountain Pedestrian Pathway

The Bald Mountain Pedestrian Pathway is 1.8 miles long, 1 mile of which is constructed parallel to park roads.
Civil Infrastructure
Development Services
Planning
Construction Phase Services
Design

Blair Street Non-Motorized Bike Path

We assisted Port Sheldon Township with the preliminary master planning of the overall trail system for the Blair Street Non-Motorized Bike Path.
Civil Infrastructure
Development Services
Drainage Design
Planning
Construction Phase Services
Design
Environmental
Permitting

South Chester and Central Charlton Separator Additions

This project entailed the installation of new natural gas two-phase separators with an automatic liquid dump system at ANR Storage’s South Chester and Central Charlton compressor stations.
Construction Phase Services
Design
Energy
Drafting
Survey