Energy
Line 6B
In this project, provided construction surveying services to Enbridge Energy for the Line 6B pipeline, which runs from Griffith, IN, to Marysville, MI.
Saginaw Trail Pipeline
In this project, we provided engineering, surveying, construction, and environmental services to Consumers Energy in support of their Saginaw Trail Pipeline Project.
GHIB 12″ New Main and I-75 Crossings
In this project, we provided engineering, surveying, and construction services to DTE Energy in support of their GHIB relocation project in Detroit.
Bare Steel Cast Iron Replacement
In this project, we were selected to perform a large portion of Dominion East Ohio’s gas distribution replacement design work.
System Reliability Design, Fort Street Project
This project as about assisting DTE in the design of a new 16-inch steel main in downtown Detroit.
Design
Energy
3D Modeling
HDD Design
Survey
Mobile LiDAR
Energy
3D Modeling
HDD Design
Survey
Mobile LiDAR
Line 3 Segment 18
Beginning at the Minnesota/Wisconsin state line, the Line 3 Segment 18 pipeline runs east to Enbridge’s Superior, WI, terminal.
Construction Phase Services
Energy
Drafting
Survey
Energy
Drafting
Survey
South Chester and Central Charlton Separator Additions
This project entailed the installation of new natural gas two-phase separators with an automatic liquid dump system at ANR Storage’s South Chester and Central Charlton compressor stations.
Construction Phase Services
Design
Energy
Drafting
Survey
Design
Energy
Drafting
Survey
Utilizing UAV and LiDAR in McHenry County, Illinois
Holland Engineering recently completed a pipeline encroachment survey in McHenry County, Illinois, using an unmanned aerial vehicle (UAV) and LiDAR.